The quality of a concrete oor or slab is highly dependent on
achieving a hard and durable surface that is at, relatively free
of cracks, and at the proper grade and elevation. Properties of the
surface are determined by the mixture proportions and the quality
of the concreting and jointing operations. The timing of concreting
operations—especially nishing, jointing, and curing—is critical.
Failure to address this issue can contribute to undesirable char-
acteristics in the wearing surface such as cracking, low resistance
to wear, dusting, scaling, high or low spots, poor drainage, and
increasing the potential for curling.
Concrete oor slabs employing portland cement, regardless of
slump, will start to experience a reduction in volume as soon as
they are placed. This phenomenon will continue as long as any
water, heat, or both, is being released to the surroundings. More-
over, because the drying and cooling rates at the top and bottom
of the slab are not the same, the shrinkage will vary throughout
the depth, causing the as-cast shape to be distorted and reduced
in volume.
This guide contains recommendations for controlling random
cracking and edge curling caused by the concrete’s normal volume
change. Application of present technology permits only a reduc-
tion in cracking and curling, not elimination. Even with the best
oor designs and proper construction, it is unrealistic to expect
completely crack- and curl-free oors. Consequently, every owner
should be advised by both the designer and contractor that it is
completely normal to expect some amount of cracking and curling
on every project, and that such an occurrence does not necessarily
reect adversely on either the adequacy of the oors design or the
quality of its construction (Ytterberg 1987).
This guide describes how to produce high-quality concrete slabs-
on-ground and suspended oors for various classes of service.
It emphasizes such aspects of construction as site preparation,
concrete materials, concrete mixture proportions, concrete work-
manship, joint construction, load transfer across joints, form strip-
ping procedures, nishing methods, and curing. Flatness/levelness
requirements and measurements are outlined. A thorough precon-
struction meeting is critical to facilitate communication among key
participants and to clearly establish expectations and procedures
that will be employed during construction to achieve the oor qual-
ities required by the project specications. Adequate supervision
and inspection are required for job operations, particularly those
of nishing.
Keywords: admixture; aggregate; consolidation; contract documents;
curing; curling; deection; durability; form; fracture; joint; mixture propor-
tioning; placing; quality control; slab-on-ground; slabs; slump test.
CONTENTS
CHAPTER 1—INTRODUCTION, p. 2
1.1—Purpose, p. 2
1.2—Scope, p. 2
CHAPTER 2—DEFINITIONS, p. 2
CHAPTER 5—DESIGN CONSIDERATIONS, p. 2
5.1—Scope, p. 2
5.2—Slabs-on-ground, p. 2
5.3—Suspended slabs, p. 7
5.4—Miscellaneous details, p. 9
Joseph F. Neuber Jr., Chair
Patrick J. Harrison, Vice Chair
Russell E. Neudeck, Secretary
ACI 302.1R-15
Guide to Concrete Floor and Slab Construction
Reported by Committee 302
Dennis C. Ahal
Bryan M. Birdwell
Peter A. Craig
Allen Face
C. Rick Felder
Edward B. Finkel
Barry E. Foreman
Greg K. Fricks
Terry J. Fricks
Jerry A. Holland
Philip S. Kopf
Steve R. Lloyd, Sr.
Kevin A. MacDonald
Arthur W. McKinney
Donald M. McPhee
Scott C. Metzger
Jeffrey S. Miller
Scott L. Niemitalo
Nigel K. Parkes
William S. Phelan
Tim H. Robinson
John W. Rohrer
Paul A. Rouis, III
Domenick Thomas Ruttura
Bruce A. Suprenant
Scott M. Tarr
Consulting Members
Carl Bimel*
Michael A. Clark
William C. Panarese
Brian J. Pashina
Boyd C. Ringo*
*Deceased
ACI Committee Reports, Guides, and Commentaries are
intended for guidance in planning, designing, executing, and
inspecting construction. This document is intended for the use
of individuals who are competent to evaluate the signicance
and limitations of its content and recommendations and who
will accept responsibility for the application of the informa-
tion it contains. ACI disclaims any and all responsibility for
the stated principles. The Institute shall not be liable for any
loss or damage arising there from.
Reference to this document shall not be made in contract
documents. If items found in this document are desired by the
Architect/ Engineer to be a part of the contract documents,
they shall be restated in mandatory language for incorporation
by the Architect/Engineer.
ACI 302.1R-15 supersedes ACI 302.1R-04 and was adopted and published June 2015.
Copyright © 2015, American Concrete Institute.
All rights reserved including rights of reproduction and use in any form or by any
means, including the making of copies by any photo process, or by electronic or
mechanical device, printed, written, or oral, or recording for sound or visual reproduc-
tion or for use in any knowledge or retrieval system or device, unless permission in
writing is obtained from the copyright proprietors.
1
CHAPTER 1—INTRODUCTION
1.1—Purpose
This guide presents information relative to the construction
of slab-on-ground and suspended-slab oors for industrial,
commercial, and institutional buildings. It is applicable to
the construction of normalweight and structural lightweight
concrete oors and slabs made with conventional portland
and blended cements. This guide identies the various classes
of oors based on use, construction design details, necessary
site preparation, concrete type, and other related materials. In
general, characteristics of the concrete slab surface and joint
performance have a powerful impact on the serviceability
of oors and other slabs. Because the eventual success of a
concrete oor installation depends on the mixture proportions
and oor nishing techniques used, considerable attention is
given to critical aspects of achieving the desired nishes and
the required oor surface tolerances.
1.2—Scope
This guide emphasizes choosing and proportioning of
materials, design details, proper construction methods, and
workmanship. Slabs specically intended for the containment
of liquids are beyond the scope of this guide. Whereas this
guide does provide a reasonable overview of concrete oor
construction, each project is unique and circumstances can
dictate departures from the recommendations given in this
guide. Contractors and suppliers should, therefore, thoroughly
review contract documents before bid preparation (Chapter 3).
CHAPTER 2—DEFINITIONS
ACI provides a comprehensive list of denitions through
an online resource, “ACI Concrete Terminology,” http://
www.concrete.org/store/productdetail.aspx?ItemID=CT13.
Denitions provided herein complement that resource.
differential set time—difference in timing from initial
introduction of water to concrete mixture at batch plant to
initial power oating.
dry-shake—dry mixture of hydraulic cement and ne
aggregate (either mineral or metallic) that is distributed
evenly over the surface of concrete atwork and worked into
the surface before time of nal setting and then oated and
troweled to desired nish.
mixture optimization indicator—intersection of the
coarseness factor value and the workability factor on the
coarseness factor chart.
rutting—creation of troughs in the soil support system in
response to applied wheel loads.
score—creation of lines or notches in the surface of a
concrete slab.
soil pumping—vertical displacement and rebound of the
soil support system in response to applied moving loads.
water slump—magnitude of slump, measured in accor-
dance with ASTM C143/C143M, which is directly attributed
to the amount of water in the concrete mixture.
window of nishability—time period available for
nishing operations after the concrete has been placed,
consolidated, and struck-off, and before nal troweling.
workability factor—percentage of combined aggregate
that passes the No. 8 (2.36 mm) sieve.
CHAPTER 5—DESIGN CONSIDERATIONS
5.1—Scope
Chapter 5 addresses the design of concrete oors as it
relates to their constructibility. Specic design requirements
for concrete oor construction are found in ACI 360R for
slabs-on-ground, ACI 223R for shrinkage-compensating
concrete oors, and ACI 421.1R and 421.2R for suspended
oors.
5.2—Slabs-on-ground
5.2.1 Required design elements—Following are the
minimum items that should be addressed in the construction
documents prepared by the designer (ACI 360R):
a) Slab-on-ground design criteria
b) Base and subbase materials, preparation requirements,
and vapor retarder/barrier, when required
c) Concrete thickness
d) Concrete compressive strength, exural strength, or
both
e) Concrete mixture proportion requirements, ultimate
drying shrinkage strain, or both
f) Joint locations and details
g) Reinforcement (type, size, and location) when required
h) Surface treatment, when required
i) Surface nish
j) Tolerances (base, subbase, slab thickness, and oor at-
ness and levelness)
k) Concrete curing
l) Joint lling material and installation
m) Special embedments
n) Testing requirements
o) Preconstruction meeting, quality assurance, and quality
control
If any of this information is not provided, the contractor
should request it from the slab-on-ground slab designer.
5.2.2 Soil-support system—Because the performance of a
slab-on-ground depends on the integrity of the soil-support
system, specic attention should be given to site preparation
requirements, including proof-rolling (6.1.1). In most cases,
proof-rolling results are much more indicative of the soil-
support system’s ability to withstand loading than from the
results of in-place tests of moisture content or density. A thin
layer of graded, granular, compactible material is normally
used as ne grading material to better control concrete’s thick-
ness and to minimize friction between the base material and
slab. For detailed information on soil-support systems, refer
to ACI 360R.
5.2.3 Moisture protection—Proper moisture protection
is essential for any slab-on-ground where the oor will
be covered by moisture-sensitive ooring materials such
as vinyl; linoleum; wood; carpet; rubber; rubber-backed
carpet tile; impermeable oor coatings; adhesives; or where
moisture-sensitive equipment, products, or environments
exist, such as humidity-controlled or refrigerated rooms.
American Concrete Institute – Copyrighted © Material – www.concrete.org
2 GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15)
ACI 302.2R provides recommendations for the design and
construction of concrete slabs that will receive moisture-
sensitive or pH-sensitive ooring materials or coatings for
both slabs-on-ground and suspended slabs.
5.2.3.1 Vapor retarder permeance—A vapor retarder/
barrier is a material that is intended to minimize the trans-
mission of water vapor upward through the slab from sources
below. The performance requirements for plastic vapor
retarder/barrier materials in contact with soil or granular ll
under concrete slabs are listed in ASTM E1745. According
to ASTM E1745 a vapor retarder/barrier material is to have a
permeance level, also known as the water vapor transmission
rate, not exceeding 0.1 perms as determined by ASTM E96/
E96M or ASTM F1249. However, most ooring installations
will benet by using a material with a permeance level well
below 0.1 perms (0.0659 metric perms = 5.72 ng/s
–1
m
–2
Pa
–1
).
The selection of a vapor retarder/barrier material and
its level of permeance should be made on the basis of the
protective requirements of the material being applied to the
oor surface or the environment being protected. Although
conventional 6, 8, and 10 mil (0.15, 0.20, and 0.25 mm)
polyethylene has been used in the past, this class of mate-
rial does not fully conform to the requirements of ASTM
E1745 and should not be considered for use as below-slab
moisture protection. Any plastic vapor retarder/barrier
material to be used below slabs should be in full compli-
ance with the minimum requirements of ASTM E1745 and
the thickness and permeance of the material be selected
on the basis of protective needs and durability during and
after installation.
However, for a material to be considered a true barrier it
would need to have a permeance level of 0.0 perms when
tested in accordance with ASTM E96/E96M or ASTM
F1249. The industry has not established a permeance level
that serves as the dividing point between materials classed
as vapor barriers or vapor retarders. It is most likely that
when a dividing point between barrier and retarder is estab-
lished it will be at 0.01 perms or less. The laps or seams for
a vapor retarder/barrier should be overlapped 6 in. (150 mm)
(ASTM E1643) or as instructed by the manufacturer. Joints
and penetrations should be sealed with the manufacturers
recommended adhesive, pressure-sensitive tape, or both.
5.2.3.2 Vapor retarder/barrier location—The decision
to locate the vapor retarder/barrier in direct contact with
the slab’s underside had long been debated. Experience
has shown, however, that the greatest level of protection
for oor coverings, coatings, or building environments is
provided when the vapor retarder/barrier is placed in direct
contact with the slab. Placing concrete in direct contact with
the vapor retarder/barrier eliminates the potential for water
from sources such as rain, saw-cutting, curing, cleaning, or
compaction to become trapped within the ll course. Wet
or saturated ll above the vapor retarder/barrier can signi-
cantly lengthen the time required for a slab to dry to a level
acceptable to the manufacturers of oor coverings, adhe-
sives, and coatings. A ll layer sandwiched between the vapor
retarder/barrier and the concrete also serves as an avenue for
moisture to enter and travel freely beneath the slab, which
can lead to an increase in moisture within the slab once it
is covered. Moisture can enter the ll layer through voids,
tears, or punctures in the vapor retarder/barrier.
Placing concrete in direct contact with the vapor retarder/
barrier requires additional design and construction consider-
ations if potential slab-related problems are to be avoided.
When compared with identical concrete cast on a draining
base, concrete placed in direct contact with a vapor retarder/
barrier shows more settlement and exhibits signicantly
larger length change in the rst hour after casting, during
drying shrinkage, and when subject to environmental
change (Suprenant 1997). Joints that open wider than what
is normally anticipated are called dominant joints (Walker
and Holland 2007). Dominant joint behavior can be made
worse when the slab is placed in direct contact with a vapor
retarder/barrier that reduces friction from the base. Where
reinforcing steel is present, settlement cracking over the
steel is more likely because of increased settlement resulting
from a longer bleeding period. There is also increased poten-
tial for a greater measure of slab curl.
Concrete that does not lose excess water to the base does not
stiffen as rapidly as concrete that does. If rapid surface drying
conditions are present, the surface of concrete placed directly
on a vapor retarder/barrier has a tendency to dry and crust over
whereas the concrete below the top fraction of an inch (milli-
meter) remains relatively less stiff or unhardened. When this
occurs, it may be necessary to begin machine operations on the
concrete surface before the concrete below the top surface is
sufciently set. Under such conditions, a reduction in surface
atness and some blistering or delamination can occur as air,
water, or both, become trapped below the nish surface.
Each proposed installation should be independently evalu-
ated for moisture sensitivity of anticipated subsequent oor
nishes and the level of protection and material strength
they might need. When placing concrete in direct contact
with the vapor retarder/barrier, the potential effects of slab
curling, crusting, and cracking should be considered. Design
and construction measures should be implemented to offset
or to minimize these effects. The anticipated benets and
risks associated with the specied location of the vapor
retarder/barrier should be reviewed (Fig. 5.2.3.2) with all
parties before construction (ACI 302.2R).
5.2.4 Supporting reinforcement—Deformed reinforcing
steel or post-tensioning tendons should be supported and tied
together sufciently to minimize movement during concrete
placing and nishing operations. Chairs with sand plates or
precast concrete bar supports are generally considered to be
the most effective method of providing the required support.
When precast concrete bar supports are used, they should be
at least 4 in. (100 mm) square at the base, have a compres-
sive strength at least equal to the specied compressive
strength of the concrete being placed, and be thick enough
to support reinforcing steel or post-tensioning tendons at the
proper elevation while maintaining minimum concrete cover
requirements.
When welded wire reinforcement is used, its larger
exibility dictates that the contractor pay close atten-
tion to establishing and maintaining adequate support of
American Concrete Institute – Copyrighted © Material – www.concrete.org
GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15) 3
the reinforcement during the concrete placing operations
(Neuber 2006). Welded wire reinforcement should not be
placed on the ground and pulled up after placement of the
concrete, nor should the mats be walked in after placing
the concrete.
Proper support spacing is necessary to maintain welded
wire reinforcement at the proper elevation; supports should
be close enough such that welded wire reinforcement cannot
be forced out of location by construction foot trafc. Support
spacing can be increased when heavier gauge wires or a
Fig. 5.2.3.2—Flow chart to determine when and where a vapor retarder/barrier should be used.
American Concrete Institute – Copyrighted © Material – www.concrete.org
4 GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15)
double mat of small-gauge wires is used. Installation should
be in accordance with the Wire Reinforcing Institute’s
(2008) recommendations.
5.2.5 Steel bers—Steel bers are used to provide rein-
forced concrete slabs-on-ground with increased strain
strength, impact resistance, exural toughness, fatigue
endurance, crack-width control, and tensile strength (ACI
544.4R). Finishing oors with steel bers is similar to other
oors, except for the potential for steel bers to become
exposed on the surface of the slab. Typically, however, occa-
sional exposed bers do not cause a problem. Section 7.2.4
discusses types of steel bers and dosages in detail.
5.2.6 Synthetic bers—Synthetic bers are used to rein-
force concrete against plastic shrinkage and drying shrinkage
stresses. Section 7.2.3 discusses types of synthetic bers and
dosages in detail.
5.2.7 Post-tensioning reinforcement—The use of high-
strength steel tendons as reinforcement instead of conven-
tional mild steel temperature and shrinkage reinforcement
introduces relatively high compressive stress in the concrete
by means of post-tensioning. This compressive stress
provides a balance for the crack-producing tensile stresses
that develop as the concrete shrinks during the drying
process. Stage stressing or partial tensioning of the slab on
the day following placement can result in a signicant reduc-
tion of shrinkage cracks. Construction loads on the concrete
should be minimized until the slabs are fully stressed (Post-
Tensioning Institute 1990, 1996). For guidelines on instal-
lation details, contact a concrete oor specialty contractor
who is thoroughly experienced with this type of installation.
5.2.8 Causes of cracking over reinforcement—Bar shad-
owing and subsidence cracking directly over reinforce-
ment is caused by inadequate consolidation of concrete,
inadequate concrete cover over the reinforcement, use of
large-diameter bars (Babaei and Fouladgar 1997; Dakhil et
al. 1975), higher temperature of reinforcing bars exposed
to direct sunlight, higher-than-required slump in concrete,
revibration of the concrete, inadequate control of evapora-
tion rate before concrete curing begins, or a combination of
these items.
5.2.9 Joint design—Joints are used in slab-on-ground
construction to limit the frequency and width of random
cracks caused by volume changes and to reduce the magni-
tude of slab curling. Slab designs with an increased number
of joints can result in decreases in curling and individual
joint opening width, resulting in less overall maintenance.
The joint details and layout of joints should be provided by
the designer. When the joint layout and joint details are not
provided before project bid, the designer should provide a
detailed joint layout along with the joint details before the
slab preconstruction meeting or commencing construction.
As stated in ACI 360R, every effort should be made to
isolate the slab from restraint that might be provided by
another element of the structure. Restraint from any source,
whether internal or external, will increase the potential for
random cracking.
Isolation, contraction, and construction joints are commonly
used in concrete slabs-on-ground. Appropriate locations for
isolation joints and contraction joints are shown in Fig. 5.2.9.
With the designers approval, construction joint and contrac-
tion joint details can be interchanged. Refer to ACI 360R for
a detailed discussion of joints. Joints in topping slabs should
be located directly over joints in the base slab.
5.2.9.1 Isolation joints—Isolation joints should be used
wherever complete freedom of vertical and horizontal
movement is required between the oor and adjoining
building elements. Isolation joints should be used at junc-
tions with walls that do not require lateral restraint from the
slab, columns, equipment foundations, footings, or other
points of restraint such as drains, manholes, sumps, and
stairways. An isolation joint may be composed of sheet
material or a preformed joint material separating two adja-
cent concrete elements; one example is where a slab abuts
a wall. Where the isolation joint will restrain shrinkage,
exible closed-cell foam plank should be used with a thick-
ness that accommodates the anticipated shrinkage move-
ment. The joint material should extend the full depth of
the slab or slightly below its bottom to ensure complete
separation. Where the joint ller will be objectionably
visible, or where there are wet conditions or hygienic or
dust-control requirements, the top of the preformed ller
can be removed and the joint caulked with an elastomeric
sealant. Three methods for producing a relatively uniform
depth of joint sealant depth are:
1. Use a saw to score both sides of the preformed ller at
the depth to be removed. Insert the scored ller in the proper
location. After the concrete hardens, use a screwdriver or
similar tool and remove the top section.
2. Cut a strip of wood equal to the desired depth of the
joint sealant. Nail the wood strip to the preformed ller
Fig. 5.2.9—Appropriate locations for joints.
American Concrete Institute – Copyrighted © Material – www.concrete.org
GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15) 5
and install the assembly in the proper location. Remove the
wood strip after the concrete has hardened.
3. Use a premolded joint ller with a removable top portion.
Refer to ACI 223R for guidance on isolation joints for
slabs using shrinkage-compensating concrete.
5.2.9.2 Construction joints—Construction joints are
placed in a slab to dene the extent of the individual concrete
placements, generally in conformity with a predetermined
joint layout. If concrete placement is ever interrupted long
enough for the placed concrete to harden, a construction
joint should be used. If possible, construction joints should
be located 5 ft (1.5 m) or more from any other joint to which
they are parallel.
In areas not subjected to trafc, a butt joint is usually
adequate. In areas subjected to hard-wheeled trafc, heavy
loadings, or both, joints with dowels are recommended.
Keyed joints are not recommended where load transfer is
required because the two sides of the keyway lose contact
when the joint opens due to drying shrinkage.
5.2.9.3 Contraction joints—Contraction joints are usually
located on column lines with intermediate joints located at
equal spaces between column lines, as shown in Fig. 5.2.9.
Factors considered when selecting spacing of contraction
joints are:
a) Slab design method (ACI 360R)
b) Slab thickness
c) Type, amount, and location of reinforcement
d) Shrinkage potential of the concrete, including cement
type and quantity; aggregate type, size, gradation, quantity, and
quality; w/cm; type of admixtures; and concrete temperature
e) Base friction
f) Floor slab restraints
g) Layout of foundations, racks, pits, equipment pads,
trenches, and similar oor discontinuities
h) Environmental factors such as temperature, wind, and
humidity
As previously indicated, establishing slab joint spacing,
thickness, and reinforcement requirements is the responsi-
bility of the designer. Because the specied joint spacing
will be a principal factor dictating both the amount and
the character of random cracking to be experienced, joint
spacing should always be carefully selected.
Floor surface curling at joints is a normal consequence
of volume change resulting from differential moisture loss
from concrete slab to the surrounding environment. This
distortion can lead to conicts with respect to installation of
some oor coverings in the months after concrete placement.
Current national standards for ceramic tile and wood ooring,
such as gymnasium oors, are two instances that require the
concrete slab surface to comply with stringent surface toler-
ances that cannot be met under typical slab curling behavior.
The designer should correlate the slab design with the require-
ments imposed by the oor covering specication in the
design documents. The potential for the joints to telegraph
through the ooring should be addressed by the design.
Some random cracking should always be expected, even
with sufciently close joint spacing. It is reasonable to expect
random visible cracks to occur in 0 to 3 percent of the surface
area oor slab panels formed by saw-cutting, construction
joints, or a combination of both. If slab curl is of greater
concern than usual, joint spacing, mixture proportion, and
joint details should be carefully analyzed. Reinforcement will
not prevent cracking. If the reinforcement is properly sized
and located, cracks should remain tightly closed.
Joints in either direction can be reduced or eliminated
by post-tensioning that introduces a net compressive force
in the slab after all tensioning losses. The number of joints
can also be reduced with the use of shrinkage-compensating
concrete; however, the recommendations of ACI 223R
should be carefully followed.
Contraction joints should be continuous, not staggered or
offset. The aspect ratio of slab panels that are unreinforced,
reinforced only for shrinkage and temperature, or made with
shrinkage-compensating concrete should be a maximum
of 1.5 to 1; however, a ratio of 1 to 1 is preferred. L- and
T-shaped panels should be avoided. Plastic or metal inserts
are not recommended for constructing or forming a contrac-
tion joint in any exposed oor surface that will be subjected
to wheeled trafc.
5.2.10 Saw-cutting joints—Contraction joints in indus-
trial and commercial oors are usually formed by sawing a
continuous slot in the slab to create a weakened plane, below
which a crack will form. Further details on saw cutting of
joints are given in 10.3.12.
5.2.11 Joint lling—Contraction and construction joints in
oor areas subject to the hard wheels of material-handling
vehicle trafc should be lled with a semi-rigid ller to
minimize wear and damage to joint edges. Construction
joints should be saw-cut 1 in. (25 mm) deep before lling.
Joints should be as narrow as possible to minimize damage
due to wheels loads while still being wide enough to be
properly lled.
Where wet conditions or hygienic requirements exist,
joints should be sealed with an elastomeric liquid sealant
or a preformed elastomeric device. If there is also indus-
trial vehicular trafc in these areas, consideration should be
given to armoring the edge of the joint through alternative
means. Refer to 7.8 for a discussion of joint materials and
11.10 for installation of joint llers.
5.2.12 Load-transfer mechanisms—Use of load-transfer
devices at construction and contraction joints is recom-
mended when positive load transfer is required, unless
a sufcient post-tensioning force is provided across the
joint to transfer the shear. Load-transfer devices force the
concrete sections on both sides of a joint to undergo approx-
imately equal vertical displacements when subjected to a
load and help prevent damage to an exposed edge when the
joint is subjected to vehicles with hard wheels such as lift
trucks. Dowel baskets should be used to maintain alignment
of dowels when used in contraction joints, and alignment
devices should be used in construction joints.
Deformed reinforcing bars should not be continued across
contraction joints or construction joints because they restrain
joints from opening as the slab shrinks during drying, unless
the reinforcement is properly designed as an enhanced
aggregate interlock load-transfer mechanism (ACI 360R).
American Concrete Institute – Copyrighted © Material – www.concrete.org
6 GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15)
Keyed joints are not recommended for load transfer in
slabs-on-ground where heavy-wheeled trafc load is antici-
pated because they do not provide effective load transfer.
When the concrete shrinks, the keys and keyways do not
retain contact and do not share the load between panels;
this can eventually cause a breakdown of the concrete joint
edges. For long post-tensioned oor strips and oors using
shrinkage-compensating concrete with long joint spacing,
care should be taken to accommodate signicant slab move-
ments. In most instances, post-tensioned slab joints are asso-
ciated with a jacking gap. The lling of jacking gaps should
be delayed as long as possible to accommodate shrinkage
and creep (Post-Tensioning Institute 1990, 2000). Where
signicant slab movement is expected, steel plating of the
joint edges is recommended for strengthening the edges.
5.3—Suspended slabs
5.3.1 Required design elements—The following items
specically impact the construction of suspended slabs and
should be included in the construction documents prepared
by the designer:
a) Frame geometry (member size and spacing)
b) Concrete reinforcement (type, size, location, and
method of support)
c) Shear connectors, if required
d) Construction joint location and details
e) Steel deck (type, depth, gauge, and installation require-
ments), if required
f) Shoring, if required
g) Tolerances (forms, structural steel, reinforcement, and
concrete)
5.3.2 Suspended slab types—In general, suspended oor
systems fall into four main categories:
a) Cast-in-place suspended oors
b) Slabs with removable forms
c) Slabs-on-composite and noncomposite steel decking
d) Topping slabs on precast concrete
Design requirements for cast-in-place concrete suspended
oor systems are covered by ACI 318 and ACI 421.1R. Refer
to these documents to obtain design parameters for various
cast-in-place systems. Slabs-on-steel decking and topping
slabs-on-precast-concrete are hybrid systems that involve
design requirements established by The Steel Deck Insti-
tute, The American Institute of Steel Construction, Precast/
Prestressed Concrete Institute, and tolerances of ACI 117.
The levelness of suspended slabs depends on the accuracy
of formwork and strike-off, but is further inuenced, espe-
cially in the case of slabs-on-steel decking, by the behavior
of the structural frame during and after completion of
construction. The contractor should recognize that each type
of structural frame behaves differently and plan accordingly.
The slab designer should discuss with the owner if the
slab surface is to be placed as near level as possible with
a varying slab thickness, or if it is more important to have
a slab with a uniform thickness, and then design the slab
and framing system accordingly. When placing slabs-on-
steel decking, the contractor is cautioned that deections
of the structural steel members can vary from those antici-
pated by the designer. Achieving a level deected surface
can require increasing the slab thickness more than 3/8 in.
(9.5 mm) in local areas. Concrete placement procedures,
increasing slab thickness to place level surfaces, and
the basis for acceptance of the levelness of a completed
concrete oor surface should be established and agreed
upon by key parties before beginning suspended oor
construction (Tipping 1992). In many cases, the deection
will not allow a level slab to be placed.
5.3.3 Slabs with removable forms—Cast-in-place concrete
construction can be either post-tensioned or convention-
ally reinforced. Both of these systems are supported during
initial concrete placement and will deect when supporting
shores are removed.
Post-tensioned systems are normally used when larger
spans are necessary or when the structural system is rela-
tively shallow for the spans considered. Post-tensioned
systems use high-strength steel tendons that are tensioned
after the concrete hardens using a hydraulic jack designed
for that purpose. The magnitude of oor slab deection after
supports are removed is less than that of comparable oors
reinforced with conventional deformed reinforcing steel. At
times, dead load deection is entirely eliminated by the use
of post-tensioning.
The magnitude of deection in a conventionally reinforced
oor system depends on a number of variables such as span,
depth of structure, age at the time forms are stripped, concrete
strength, and amount of reinforcement. In locations where
the anticipated dead load deection of a member is deemed
excessive by the designer, an initial camber, generally 1/2 in.
(13 mm) or more, can be required. The amount of camber is
determined by the designer based on an assessment of the
loading conditions discussed. Ideally, the cambered oor
system will deect down to a level position after removal of
the supporting shores.
5.3.4 Slabs-on-carton forms—Slabs-on-carton forms are a
special application of slabs with removable forms (Tipping
and North 1998). These slabs are necessary when slabs at
ground level should remain independent of soil movement.
Slabs-on-carton forms are most commonly used when soils
at the building site are expansive clays subject to signicant
movement as a result of moisture variation. They provide
a more economical construction solution than conventional
framing systems, which require a crawl space to remove
forms. The cardboard carton forms deteriorate in the months
following construction, eventually leaving the desired void
space below the slab and forcing the slab to span between
supporting foundation elements.
Experience has shown that certain types of wet cardboard
carton forms can fail locally under the weight of concrete
and construction activities, resulting in a loss of part or all
of the desired void space in the vicinity of the form failure.
This failure can occur immediately or up to 30 or 45 minutes
after strike-off. The latter type of failure, in addition to
reducing desired void space, can result in a loss of local slab
levelness. Forms that have been damaged by rain should be
replaced or allowed to dry thoroughly, with their capacity
veried, before concrete placement.
American Concrete Institute – Copyrighted © Material – www.concrete.org
GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15) 7
5.3.5 Slabs-on-steel-deck—Construction of slabs-on-steel-
deck involves the use of a concrete slab and a supporting
platform consisting of structural steel and steel deck. The
structural steel can be shored or unshored at the time of
concrete placement. The steel deck serves as a stay-in-
place form for the concrete slab. This construction can be
composite or noncomposite.
The supporting steel platform for slabs-on-steel-deck is
seldom level. Variation in elevations at which steel beams
connect to columns and the presence of camber in some oor
members combine to create variations in the initial eleva-
tion of steel members. Regardless of the initial levelness of
the steel frame, unshored frames will deect during concrete
placement. These factors make the use of a laser or similar
instrument impractical for the purpose of establishing a
uniform elevation for strike-off of the concrete surface of
a slab-on-steel-deck, unless the frame is preloaded to allow
deection to take place before strike-off and slab thickness
is allowed to vary.
5.3.6 Composite slabs-on-steel-deck—In composite
construction, the composite section, which consists of the
concrete slab and steel beams, will work together to support
any loads placed on the oor surface after the concrete
has hardened. Composite behavior is normally developed
through the use of shear connectors welded to the struc-
tural steel beam. These shear connectors physically connect
the concrete slab to the beam and engage the concrete slab
within a few feet of the steel beam with a resulting load-
carrying element that is congured much like a capital T.
The steel beam forms the stem of the T, and the oor slab
forms the crossbar. Construction joints that are parallel to
structural steel beams should be located far enough away
to eliminate their impact on composite behavior. Questions
about the location of construction joints should be referred
to the project designer (Ryan 1997).
Unshored composite construction is the more common
method used by designers because it is less expensive than
shored construction. In unshored construction, the struc-
tural steel beams are sometimes cambered slightly during
the fabrication process. This camber is intended to offset
the anticipated deection of that member under the weight
of concrete. Ideally, after concrete has been placed and the
system has deected, the resulting oor surface will be level
(Tipping 2002).
Shored composite concrete slabs-on-steel-deck are similar
to slabs with removable forms; both are supported until the
concrete has been placed and reaches the required strength.
Structural steel oor framing members for shored composite
slabs-on-steel deck are usually lighter and have less camber
than those used for unshored construction with similar
column spacings and oor loadings. One major concern with
shored composite construction is the tendency for cracks
wider than 1/8 in. (3 mm) to form in the concrete slab when
the supporting shores are removed. These cracks do not
normally impair the structural capacity of the oor but can
become an aesthetic problem. The contractor is cautioned
that this issue and any measures taken by the designer to
avoid the formation of this type of crack should be addressed
to the satisfaction of key parties before beginning suspended
oor construction.
5.3.7 Noncomposite slabs-on-steel-deck—In noncom-
posite construction, the slab and supporting structural steel
work independently to support loads imposed after hard-
ening of the concrete slab.
5.3.8 Topping slabs-on-precast-concrete—A cast-in-
place concrete topping on precast/prestressed concrete units
involves the use of precast elements as a combination form
and load-carrying element for the oor system. The cast-in-
place portion of the system consists of a topping of some
specied thickness placed on top of the precast units. The
topping can be composite or noncomposite. In either case,
added deection of precast units under the weight of the
topping slab is normally minor, so the nished surface will
tend to follow the surface topography established by the
supporting precast units. The camber in precast members,
if they are prestressed, can change with time as a result of
concrete creep. Depending on the length of time between
casting of precast units and erection, this potential variation
in camber of similar members can create signicant chal-
lenges for the contractor. Care should be taken scheduling
such operations to minimize the potential impact of these
variations. The potential for signicant variations in the
preplacement camber of supporting precast members and
the relative lack of options associated with eld changes
or modications create a unique challenge to the contractor
when the desire is to produce a surface that is uniformly
level or uniformly sloped. It is imperative that preplace-
ment discussions be held concerning anticipated deec-
tion, minimum required topping thickness, and allowable
increase in topping thickness beyond that required by the
drawings that may be necessary to achieve the desired
product. A preplacement survey of the erected precast is a
critical component of those discussions.
5.3.9 Reinforcement—For cast-in-place concrete
suspended slabs, reinforcing steel location varies as
dictated by the construction documents. The reinforcement
amount as a minimum should meet the ACI 318 building
code requirements. However, for slabs that will have
surfaces exposed to view, the slab designer should discuss
with the owner any additional reinforcement that may be
required to control the crack widths to meet the owners
crack width expectations. It should be noted that, for
exposed slabs, the minimum amount of steel required by
the building code may not be sufcient to meet the owners
expectations for crack widths (ACI 224R). For suspended
slabs supporting vehicular trafc such as cars, trucks, and
lift trucks, reinforcement amounts should be carefully
considered to maintain the crack width sufciently tight to
minimize crack spalling due to this fatigue-loading condi-
tion (ACI 215R). Post-tensioning reinforcement, when
used, is enclosed in a plastic or metal sleeve, unbonded,
and tensioned by a hydraulic jack after the concrete reaches
sufcient compressive strength. Elongation and subsequent
anchoring of the ends of post-tensioning tendons result in
the transfer of compressive force to the concrete (Post-
Tensioning Institute 1990).
American Concrete Institute – Copyrighted © Material – www.concrete.org
8 GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15)
5.3.10 For slabs-on-composite-steel-deck, the composite
steel deck provides the positive moment reinforcement for
static gravity loads and, if needed, negative moment rein-
forcement can be used. Composite steel deck is not recom-
mended as the only reinforcement for use in applications
where the oor is subjected to repeated vehicular trafc
such as lift trucks or similar heavy wheeled trafc (ANSI/
SDI C-2011). Temperature and shrinkage reinforcement for
composite steel deck slabs can be provided by deformed
reinforcing steel, welded wire reinforcement, steel bers,
macrosynthetic bers, or a combination thereof (ANSI/SDI
C-2011). For noncomposite slabs, the reinforcement is the
same as for cast-in-place suspended slabs with the steel deck
acting as a stay-in-place form (ANSI/SDI NC-2010).
5.3.11 Construction joints—The designer should provide
criteria for location of construction joints in suspended
slabs. The following is a general discussion of criteria that
can inuence these decisions.
5.3.11.1 Slabs on removable forms—Construction joints
can introduce weak vertical planes in an otherwise mono-
lithic concrete member, so they should be located where
shear stresses are low. Under most gravity load conditions,
shear stresses in exural members are low in the middle
of the span. ACI 318 requires that construction joints in
oors be located within the middle third of spans of slabs,
beams, and primary beams. Joints in girders should be
offset a minimum distance of two times the width of any
intersecting beams.
5.3.11.2 Composite slabs-on-steel-deck—An important
consideration when deciding on the location of construc-
tion joints in composite slabs-on-steel-deck is that the joint
location can inuence deection of the oor framing near
the joint. A composite member, which is the steel beam
and hardened concrete slab working together, is stiffer and,
therefore, deects less than a noncomposite member, which
is the steel beam acting alone. Most composite slabs-on-
steel-deck are placed on an unshored structural steel oor
frame. Often, structural steel members have initial camber
to offset anticipated noncomposite deection resulting
from concrete placement. After hardening of the concrete,
however, the composite member deects much less than a
comparable noncomposite beam or primary beam.
The following are general guidelines for deciding
on the location of construction joints in composite
slabs-on-steel-deck:
a) Construction joints that parallel secondary structural
steel beams should be placed near the middle third of the
slab between beams.
b) Construction joints that parallel primary structural steel
beams and cross secondary structural steel beams should be
placed near the primary beam. The primary structural steel
beam should be excluded from the initial placement. Place
the construction joint far enough away from the primary
beam to allow sufcient distance for development of the
primary beam ange width. Placing the construction joint
a distance of 4 ft (1.2 m) from the primary beam is usually
sufcient for this purpose. This construction joint location
allows nearly the full dead load from concrete placement
to be applied to secondary beams that are included in the
initial concrete placement. The primary beam should gener-
ally be included in the second placement at the construction
joint. This will allow the primary beam to deect completely
before concrete at the primary beam hardens; construction
joints that cross primary structural steel beams should be
placed near a support at one end of the primary beam. This
will allow the beam to deect completely before concrete at
the beam hardens.
5.3.11.3 Noncomposite slabs-on-steel-deck—The place-
ment of construction joints in noncomposite slabs-on-steel-
deck should follow the same general guidelines discussed
for slabs-on-removable-forms in 5.3.11.1.
5.3.11.4 Topping slabs-on-precast-concrete—Construc-
tion joints in topping slabs-on-precast-concrete should be
placed over joints in the supporting precast concrete.
5.3.12 Cracks in slabs-on-steel-deck—Cracks often
develop in slabs-on-steel-deck. These cracks can result from
loadings, drying shrinkage, thermal contraction, or variations
in exibility of the supporting structural steel and steel deck.
In a composite oor framing system, primary beams are the
stiffest elements and generally deect less than secondary
beams. The most exible part of the oor framing assembly
is the steel deck, which is often designed for strength rather
than for exibility consideration.
Vibration as a result of power oating and power trow-
eling operations can produce cracking over the structural
steel beams during concrete nishing operations if the steel
deck is exible. As the concrete cures and shrinks, these
cracks will open wide if not restrained by reinforcing steel—
usually deformed or welded wire reinforcement—located
near the top surface of the slab. Steel and macrosynthetic
bers have also been effective in controlling crack widths.
5.4—Miscellaneous details
5.4.1 Heating ducts—Heating ducts embedded in a
concrete slab can be metal, rigid plastic, or wax-impregnated
cardboard. Ducts with waterproof joints are recommended.
When metal ducts are used, calcium chloride should not be
used in the concrete.
5.4.2 Edge insulation—Edge insulation for slabs-on-
ground is desirable in most heated buildings. The insulation
should be in accordance with ANSI/ASHRAE/IES 90.1. It
should not absorb moisture; be resistant to fungus, rot, and
insect damage; and not be easily compressed.
Insulation should preferably be placed vertically on the
inside of the foundation. It can also be placed in an L-shape
conguration adjacent to the inside of the foundation and
under the edge of the slab. If the L-shape conguration is
used, the installation should extend horizontally under the
slab a total distance of 24 in. (600 mm).
5.4.3 Radiant heating: piped liquids—Slabs can be heated
by circulating heated liquids through embedded piping.
Ferrous, copper, or plastic pipe is generally used with not
less than 1 in. (25 mm) of concrete under the pipe and 2 to
3 in. (50 to 75 mm) of concrete cover over the pipe. The
slab is usually monolithic and the concrete placed around the
piping, which is xed in place. Two-course slab construc-
American Concrete Institute – Copyrighted © Material – www.concrete.org
GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R-15) 9
tion has also been used, wherein the pipe is laid, connected,
and pressure-tested for tightness on a hardened concrete
base course. Too often, however, the resulting cold joint is a
source of distress during the service life.
Insulating concrete made with vermiculite or perlite
aggregate or cellular foam concrete can be used as a suboor.
The piping should not rest directly on this or any other base
material. Supports for piping during concrete placement
should be inorganic and nonabsorbent; precast concrete bar
supports are preferred to random lengths of pipe for use as
supports and spacers. Wood, brick, or fragments of concrete
or concrete masonry should not be used.
Sloping of the slab, where possible, can simplify sloping of
the pipe. Reinforcement, such as welded wire reinforcement,
should be used in the concrete over the piping. Where pipe
passes through a contraction or construction joint, a provi-
sion should be made for possible movement across the joint.
The piping should also be protected from possible corrosion
induced by chemicals entering the joint. The piping should
be pressure-tested before placing concrete by air pressure,
but not water pressure, and should be maintained in the pipe
during concrete placement operations. After concreting, the
slab should not be heated until concrete curing is complete.
The building owner should be warned to warm the slabs
gradually using lukewarm liquid in the system to prevent
cracking of the cold concrete.
5.4.4 Radiant heating: electrical—In some electrical
radiant heating systems, insulated electrical cables are laid
singly in place within the concrete or fastened together on
transverse straps to form a mat. One system employs cable
fastened to galvanized wire sheets or hardware cloth. The
cables are embedded 1 to 3 in. (25 to 75 mm) below the
concrete surface, depending on their size and operating
temperature. In most systems, the wires, cables, or mats are
laid over a bottom course of unhardened concrete, and the
top course is placed immediately over this assemblage with
little lapse of time to avoid the creation of a horizontal cold
joint (ASHVE 1955).
Calcium chloride should not be used where copper wiring
is embedded in the concrete; damage to insulation and
subsequent contact between the exposed wiring and rein-
forcing steel will cause corrosion. If admixtures are used,
their chloride contents should comply with the limits recom-
mended by ACI 222R.
5.4.5 Snow melting—Systems for melting snow and ice
can be used in loading platforms or oor areas subjected
to snow and ice. The concrete should be air-entrained for
freezing-and-thawing resistance. Concrete surfaces should
have a slope not less than 1/4 in./ft (20 mm/m) to prevent
puddles from collecting. Piping systems should contain a
suitable liquid heat-transfer medium that does not freeze at
the lowest temperature anticipated. Calcium chloride admix-
tures should not be used with snow-melting systems. Expe-
rience has shown that these snow-melting piping systems
demand high energy consumption while displaying a high
potential for failure and thermal cracking.
5.4.6 Pipe and conduit—Water pipe and electrical conduit,
if embedded in the oor, should have at least 1-1/2 in.
(38 mm) of concrete cover on both the top and bottom.
5.4.7 Slab embedments in harsh environments—Care
should be exercised in using heating, snow-melting, water, or
electrical systems embedded in slabs exposed to harsh envi-
ronments such as parking garages in northern climates and
marine structures. If not properly embedded, systems can
accelerate deterioration by increasing seepage of saltwater
through the slab or by forming electrical corrosion circuits
with reinforcing steel. If concrete deterioration occurs, the
continuity and effective functioning of embedded systems
are invariably disrupted.