BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM
Letter of Intent and Initial
Planning Funding
Grant Application Guidance
Table of Contents
Grant Application Guidance Overview ..................................................................................................... 5
1.0 Program Guidance ................................................................................................................................ 7
1.1 Before You Get Started .............................................................................................................. 7
1.2 Standard Terms and Conditions for Department of Commerce Grants ..................................... 7
1.3 BEAD Program Eligible Entities ................................................................................................. 7
1.4 Key Submission Dates and Electronic Submission Requirement ............................................. 8
1.4.1 Application Templates ................................................................................................ 8
1.4.2 Uploads without Templates ........................................................................................ 8
1.5 Final Considerations .................................................................................................................. 9
2.0 NTIA Grants Portal Registration ........................................................................................................ 11
2.1 How to Access the NTIA Grants Portal .................................................................................... 11
2.2 NTIA Grant Programs Page ..................................................................................................... 11
2.3 Log in and Self-Registration ..................................................................................................... 12
2.3.1 Log in ....................................................................................................................... 12
2.3.2 Reset Password ....................................................................................................... 13
2.3.3 Portal Self Registration ............................................................................................ 13
2.3.4 Registration Welcome Email with Initial Login Link ................................................. 14
2.4 Setting Up Multi-Factor Authentication .................................................................................... 15
2.4.1 Downloading and Installing the Salesforce Authenticator ....................................... 15
2.4.2 Connecting the Salesforce Authenticator to Your NTIA Grant Portal Login ............ 15
2.5 Log into the NTIA Grants Portal Using the Connected Authenticator App .............................. 16
3.0 NTIA Grants Portal Workspace .......................................................................................................... 19
3.1 Welcome to the NTIA Grants Portal ......................................................................................... 19
3.2 Application Workspace Tab ..................................................................................................... 20
3.3 Application Team Tab .............................................................................................................. 20
3.4 Funding Requests Tab ............................................................................................................. 21
3.4.1 Reviewing Documents that have been uploaded .................................................... 21
3.5 Saving Your Work and Logging Out ........................................................................................ 23
4.0 BEAD Application Step by Step Instructions ................................................................................ 25
4.1 Letter of Intent (LOI) ................................................................................................................. 25
4.1.1 LOI Template ........................................................................................................... 26
4.1.2 LOI Submission Instructions .................................................................................... 26
BEAD Initial Planning Funds Application Instructions .................................................................... 30
4.2 Project Narrative and Eligibility ................................................................................................ 30
4.2.1 Project Summary for Initial Planning Funds ............................................................. 30
4.2.2 Activities Allowed for Initial Planning Fund .............................................................. 31
4.2.3 Project Narrative and Eligibility Submission Instructions ......................................... 32
4.3 Form 424 (Application for Federal Assistance) ........................................................................ 33
4.3.1 Program and Project Information ............................................................................. 35
4.3.2 Estimated Funding ................................................................................................... 36
4.3.3 Questions ................................................................................................................. 36
4.3.4 Authorized Organizational Representative .............................................................. 36
4.4 Budget Form 424C ................................................................................................................... 37
4.4.1 Budget Form 424C Submission Instructions ........................................................... 39
4.5 Detailed Budget Justification and Budget Narrative ................................................................ 40
4.5.1 Budget Narrative ...................................................................................................... 40
4.5.2 Administrative and Legal Expenses ......................................................................... 41
4.5.3 Sample Justification for Federally Funded Activities ............................................... 41
4.5.4 Detailed Budget Justification .................................................................................... 42
4.5.5 Detailed Budget Justification and Budget Narrative Submission Instructions ......... 42
4.6 Negotiated Indirect Cost Rate Agreement as applicable ...................................................... 43
4.7 Additional Required Documents .............................................................................................. 44
4.7.1 Form CD-511- Certification Regarding Lobbying ..................................................... 44
4.7.2 Standard Form-LLL- Disclosure of Lobbying Activities ............................................ 44
4.7.3 SAM.gov registration ................................................................................................ 44
4.7.4 Additional Required Documents Submission Instructions ....................................... 44
4.8 Attestation & Application Submission ...................................................................................... 45
Appendix .................................................................................................................................................... 49
Repository of Documents Required for Download ......................................................................... 49
GRANT APPLICATION
GUIDANCE OVERVIEW
Grant Application Guidance Overview
This document has been created to support applicants as they submit a Letter of Intent (LOI) and an
Initial Planning Funding application. Step-by-step instructions are provided to familiarize applicants with
the NTIA Grants Portal, outline each component of the application, and provide direction on where to
access forms and templates. The document is structured in the following four sections:
There are multiple forms required to complete the Letter of Intent and Initial Planning Funds Grant
Application for NTIA’s Broadband Equity, Access, and Deployment (BEAD) Grant program. Application
materials will include the following forms:
PROGRAM GUIDANCE
7
1.0 Program Guidance
1.1 Before You Get Started
Before preparing and submitting an application,
Eligible Entities (applicants) are encouraged to
read the Broadband Equity, Access, and
Deployment (BEAD) Notice of Funding
Opportunity (NOFO), this Grant Application
Guidance, and the BEAD Program page
. By
carefully reviewing these materials, applicants
will help ensure that their Letter of Intent and
application for Initial Planning Funds are
complete and satisfy the requirements of the
BEAD Grant Program. Please note that all
applicants are required to be current and
registered in
www.SAM.gov and have a UEI number in order to receive a Federal award.
1.2 Standard Terms and Conditions for Department of Commerce Grants
All BEAD awardees are required to comply with all applicable provisions set forth in the following:
Uniform Administrative Requirements, Cost Principles and Audit Requirements: Through 2 C.F.R.
§ 1327.101, the Department of Commerce adopted Uniform Administrative Requirements, Cost
Principles, and Audit Requirements for Federal Awards at 2 C.F.R. Part 200, which apply to
awards in this Program. Refer to
http://go.usa.gov/SBYh and http://go.usa.gov/SBg4.
Department of Commerce Financial Assistance Standard Terms and Conditions: The Department
of Commerce will apply the Financial Assistance Standard Terms and Conditions in effect on the
date of award to each award in this Program. The current version, dated November 12, 2020, is
accessible at
Department of Commerce Financial Assistance Standard Terms and Conditions.
Pre-Award Notification Requirements: The Department of Commerce will apply the Pre-Award
Notification Requirements for Grants and Cooperative Agreements dated December 30, 2014 (79
FR 78390), accessible at
http://go.usa.gov/hKkR.
1.3 BEAD Program Eligible Entities
To be eligible for funding under BEAD, applicants must be one of the following types of Eligible Entities: a
State of the United States, the District of Columbia, Puerto Rico, American Samoa, Guam, the U.S. Virgin
Islands (USVI), and the Commonwealth of the Northern Mariana Islands (CNMI).
Only one Letter of Intent and Initial Planning Funds application from each of these Eligible Entities
will be accepted. In the Letter of Intent, the Eligible Entity must name the agency, department, or
office that will serve as the recipient of, and administering agent for, any BEAD Program award. The
Eligible Entity must also identify an individual who will serve as the main point of contact at that
agency, department, or office for the purposes of the BEAD Program, referred to as the Authorized
Organization Representative (as specified by the 424 Form).
Registering with System Award Management
To register or check your SAM.gov registration, go to
https://www.sam.gov and complete the online SAM
registration process. Through this process, you will
obtain a UEI (Unique Entity Identifier) or verify if your
organization already has one. Note that a new
SAM.gov registration or renewal of an expired
SAM.gov registration can take up to 7-10 business
days to process after being submitted on SAM.gov.
8
1.4 Key Submission Dates and Electronic Submission Requirement
NTIA’s electronic application system, the NTIA Grants Portal (NGP), will be available at
https://grants.ntia.gov
beginning on May 13, 2022. At that time, applicants may submit the Letter of Intent
and, following the submission of the Letter of Intent, the BEAD Initial Planning Funds application. Upon
completion of the application and submission to the NTIA Grants Portal, the NTIA Grants Portal will send
an email to the Authorized Organization Representative with a date and time stamped confirmation of
submission. NTIA will review applications in the order they are received. As such, applicants are strongly
encouraged to submit their applications as early as possible to avoid last-minute congestion on the intake
system and facilitate early review.
All applicants must submit the required materials through the NTIA’s electronic application submission
system, the NTIA Grants Portal, which can be accessed at https://grants.ntia.gov
. The application
package for electronic submission, including templates, are available on the Project Profile page in the
NTIA Grants Portal and on the BEAD program page on
BroadbandUSA. NTIA will not accept Letters of
Intent or Initial Planning Fund applications via email, fax, or postal mail.
1.4.1 Application Templates
Applicants are required to submit a number of documents using templates or downloadable forms. To
ensure an expeditious review of applications, these documents must be uploaded in the same file type
as the provided template or as indicated in the template. In addition, the formatting of each uploaded
document must be consistent with that used in the provided template. Failure to provide files
consistent with the templates will result in NTIA being unable to automatically process the application and
may result in the delayed processing of the application.
The following forms are available to download at www.grants.gov
:
CD-511
SF-LLL
The following templates are available to download on the
NTIA
Grants Portal:
Budget Narrative
Detailed Budget Justification
The following documents are built directly into the Portal:
SF-424
SF-424C
Project Summary and Eligibility
Applicants should ensure that their uploaded files are not password protected.
1.4.2 Uploads without Templates
Applicants will need to upload documents that do not require or do not have a standardized template, such
as the Letter of Intent. For example, while a template is provided for the Letter of Intent, use of this template is
not required. In general, NTIA recommends applicants upload Letters in PDF format. For other such
templates, please submit in its native form (i.e., if the template is in Excel, submit as an Excel file). Further
guidance is provided as to how to submit these documents throughout this instruction.
Applicants should ensure that their uploaded files are not password protected.
Catalog of Federal
Domestic Assistance
Number
The Catalog of Federal
Domestic Assistance (CFDA)
number for the BEAD Grant
Program is 11.035. The CFDA
title for BEAD is Broadband
Equity, Access, and
Deployment Program.
9
1.5 Final Considerations
Before applying, applicants should fully read the NOFO and other Technical Assistance
materials available on the BEAD Program page on www.internetforall.gov
, as well as applicable
OMB circulars governing administrative requirements, cost principles, and audits (refer to above
Section 1.2).
Applicants may receive funding only for costs established in the NOFO as eligible costs
for the appropriate project category.
By submitting an application, the applicant certifies that the information and responses in the
application are material representations of fact and are true and correct.
Once the application has been submitted, it is presumed that the application is final and the
applicant will no longer be able to make changes to the application in the portal. If an applicant
needs to make changes to an application, the applicant must contact NTIA for assistance.
10
NTIA GRANTS PORTAL
REGISTRATION
11
2.0 NTIA Grants Portal Registration
2.1 How to Access the NTIA Grants Portal
The NTIA Grants Portal is where the
application will be completed, and it can be
accessed here:
https://grants.ntia.gov/grantsPortal/s/
Use one of the following browsers to access
the Portal. Refer to the
Supported Browsers to
Access the Portal page for more information.
Chrome Latest Release
(Recommended)
Microsoft Edge Chromium
(Recommended)
Mozilla Firefox Latest Release
Safari
2.2 NTIA Grant Programs Page
Click the Learn More button under the
Broadband Equity Access and
Deployment (BEAD) Program to get to
the BEAD program home page.
When you click the Learn More button
on the landing page, you will be taken to
the Program specific Home page (the
BEAD program home page is illustrated
to the left).
If you are logged in, you can start your
application for the BEAD Program by
clicking the Apply Now button.
If you have not logged in, the button will
show Log in to APPLY Now, which will
redirect you to the login page. Once
logged in, return to the Program Home
page and click Apply Now.
12
2.3 Log in and Self-Registration
Click the Log in button in the upper right corner to sign in as a registered Portal user or to self-register the
first time you access the portal.
2.3.1 Log in
If you are new to the portal and need to register for the
first time, click Register below the blue Log in button.
If you have a Username and Password, enter the
username and password and click the blue Log in
button to move forward.
Important: Upon completing registration, your
Username will be the email address used to register for
the NTIA Grants Portal appended with .ntiaas the
suffix. As an example, for JohnSmith@organization.com
email address, the Username would be
JohnSmith@organization.com.ntia.
If you forgot your password, click Forgot your
password? below the blue Log in button on the login screen.
13
2.3.2 Reset Password
Enter your Username, which is the email address used
to register for the NTIA Grants Portal appended with
.ntiaas the suffix. As an example, for
JohnSmith@organization.com email address, the
Username would be JohnSm[email protected]tia.
Then click the Reset Password button,or click Cancel
to cancel and return to the login screen.
For assistance, email the NTIA Grants Portal Help Desk
.
2.3.3 Portal Self Registration
As part of the Portal registration process, approval is required before completing registration. The person
who initiates the Application, referred to as the “applicant,” does not necessarily need to be the AOR.
However, only the AOR will be able attest that all statements are true and submit the application.
Follow the steps below to register, NTIA will send an
approval email with a link to complete the process.
1. Register to access the NTIA Grants Portal by
entering contact information in the fields provided.
A red asterisk (*) indicates a required field. Once all
fields are completed, click the blue Sign Up button.
Note: Sam.gov UEI registration information will be
required at a later step in the application process.
If you have registered previously, click Already
have an account? to log in.
2. Click the Entity Type field to select the entity type.
For State/Territory Government entity types, start
typing the name of your State or Territory in the
State/Territory Organization Name field to select the
from the list of States and Territories. Click the blue
Sign Up button to complete the registration
process.
14
3. Keep an eye out for the approval
email, confirming your registration and
steps to complete the registration and
login process.
In the event of receiving an email
indicating that you are not
approved, contact NTIA for
assistance.
2.3.4 Registration Welcome Email with Initial Login Link
4. Open your Welcome Email and click on the
login link.
Important: Your Username is your email
address appended with .ntia, please make a
note of it for future use when logging into the
Portal.
5. You will be asked to Change Your Password. Enter a
password according to the requirements indicated, then click
the Change Password button.
15
2.4 Setting Up Multi-Factor Authentication
After setting up your password, you will be asked to set up a verification method using Multi-Factor
Authentication (MFA) to verify your identity each time you log in. You will be guided in the subsequent
steps to download and install an authentication app of your
choice onto your mobile device.
1. Click the radio button to select the app you prefer to
use either the Salesforce Authenticator mobile app or
another authenticator app. Once selected, click the
Continue button.
For more information about using the Salesforce
Authenticator mobile app for multi-factor
authentication, view this video:
How to Use
Salesforce Authenticator for MFA Logins.
2. If you selected to use the Salesforce Authenticator mobile app verification method, follow the
instructions on the Connect Salesforce Authenticator screen, or use the instructions outlined in
the following sections.
2.4.1 Downloading and Installing the Salesforce Authenticator
1. Search for Salesforce Authenticator in your phone’s app store.
a. iPhone/iOS users will search in the Apple App Store.
b. Android users will search in the Google Play Store.
2. Follow your screen’s prompts to install the app on your phone.
3. Open the Salesforce Authenticator app and follow the verification setup activities when you are
prompted (mobile number verification, four-digit passcode setup).
2.4.2 Connecting the Salesforce Authenticator to Your NTIA Grant Portal Login
1. In the Salesforce Authenticator app on your mobile device, tap Add an Account.
2. A unique two-word phrase will appear in the app, enter the phrase into the Connect Salesforce
Authenticator screen and click Connect.
3. Confirm the connection in the Salesforce Authenticator app and you will have successfully paired
your account.
What is Multi-Factor Authentication?
Multi-factor authentication (MFA) is a digital authentication method used to confirm the identity of a user to allow
them access to a website or app through at least two pieces of evidence. With an authenticator app downloaded
onto your mobile device, users are given an automatically generated code that refreshes, typically every 30
seconds. Using an authenticator app on your mobile device bolsters your online security.
16
Note: You will only need to connect your account once. You will continue to use the Salesforce
Authenticator to approve future logins.
If you opt to use another authenticator app (other than the Salesforce
Authenticator App), follow the instructions on the Connect an
Authenticator App screen. The following is a list of commonly used
Authenticator Apps available to download from the app store onto your
mobile device:
Google Authenticator
Lastpass
Microsoft Authenticator
Authy by Twilio
2FA Authenticator
Duo Mobile
Aegis Authenticator
Note: You will only need to connect (pair) your account once with an
authenticator app. You will continue to use the authenticator app to approve future logins.
2.5 Log into the NTIA Grants Portal Using the Connected Authenticator App
17
https://grants.ntia.gov/grantsPortal/s/
Once you have installed and connected the authenticator app on
your mobile device, you will continue to use the app to verify your
identity each time you log into the Portal.
1. Enter your Username (your email address appended with
.ntia) and Password into the fields in the NTIA Grants
Portal on your computer web browser. The Portal will send
a notification to your mobile device.
2. The authenticator app will provide details of the login
request, including Username, Service, Device, and
Location.
3. Review the login details, then tap Approve; if you do not
recognize the request, tap Deny.
Note: To make logging in easier, enable Always approve from
this location from the Salesforce Authenticator to automatically
approve requests matching location and login information.
18
NTIA GRANTS PORTAL
WORKSPACE
19
3.0 NTIA Grants Portal Workspace
3.1 Welcome to the NTIA Grants Portal
The Home button at the top of the screen returns you to your NTIA Grants Portal home page. The
Support button takes you to a screen with NTIA Support contact information.
If you have not started a grant request, the My Grant Request(s) section will be empty. Use the following
steps to initiate a grant request:
1. From the Available Programs section, click on the link Broadband Equity, Access, and
Deployment (BEAD).
2. Click the Apply Now button. If needed, access additional information through links under
Resources.
20
3.2 Application Workspace Tab
The Application Workspace tab contains the sections of
the overall application request process listed in the order in
which to complete the application:
Letter of Intent
Project Narrative and Eligibility
Form 424
Budget Form 424C
Detailed Budget Justification and Budget
Narrative
Additional Required Documents
Attestation and Generate Forms, and Submit
Each section reflects a Section Status, including Not Started, In Progress, and Completed.
3.3 Application Team Tab
Add team members early on who will participate in the application process. Each team member will
require their own login credentials to input application information. To ensure coordination on application
inputs, work with all team members on planned application activities so as not to overwrite application
information.
When adding a team member who needs access to the
current application, note that only one applicant role and
only one Authorized Organizational Representative (AOR)
role can be assigned to an application. Changing the
applicant role to another user or adding or changing the
Authorized Organizational Representative can only be done
in the Form 424 section in the NTIA Grants Portal.
1. Click the Application Team tab, then click the +
Add Contact button. Indicate if the contact is
outside of your organization by selecting Yes or No
from the drop-down menu.
2. Enter the new team member contact information in
the Add Contact fields. A red asterisk (*) indicates a
required field. Click the Save button, or the Save &
New button to add additional team members. Click
the Close button to close the Add Contact section.
The new team member will receive a Welcome Email
with a link to log into the portal.
Note: The link in the Welcome Email will expire after 7 days. If
21
a new login link is needed, the applicant team member can go to Forgot your password? on the login
page and enter their Username to receive a new login link via email. Alternatively, the team member can
contact NTIA to request a new email with a login link.
To update the role of an application team member,
click the drop-down menu under Role and select
the new role, then click the Save button. To
remove a team member, click the drop-down
menu under Status to select either Current or
Former status, then click the Save button.
Note: You will be able to see who is assigned as
applicant and as Authorized Organizational
Representative (AOR), but you cannot manage
those users within the Application Teams tab. To
change the applicant or to add or change the
AOR, you will need to create a new Form 424.
3.4 Funding Requests Tab
To view the overall status of the application, click the Funding Requests tab.
3.4.1 Reviewing Documents that have been uploaded
1. Click on the Funding Requests tab.
2. Click on the Planning Application.
22
3. Click on the Related tab.
4. Under the Related tab you will be able to review the list of documents that will have been uploaded
to the application. Click on the document you wish to review.
5. For each document you will be able to see any versions that have been uploaded, open and review
them or download them. Only add documents through the Application Workspace to ensure your
application is correct.
23
3.5 Saving Your Work and Logging Out
Important: Save your work within any section by clicking the ‘Save’ or ‘Next’ button, the Section Status
will display as In Progress. Click the Continue button to return your saved work. If you enter
information on a screen and do not click Save or Next, your work will not be saved and you will
need to re-enter it.
To log out of the Portal, click the profile icon in the upper right then click Logout.
24
BEAD APPLICATION
STEP BY STEP
INSTRUCTIONS
25
4.0 BEAD Application Step by Step Instructions
4.1 Letter of Intent (LOI)
An applicant may submit only a single Letter of Intent (LOI). NTIA has created a template for applicants to
use in drafting the LOI. Please note that use of this template is not required. However, LOIs must be
signed by the Governor or equivalent chief executive of the Eligible Entity and submitted through the
NTIA portal by July 18, 2022. Applicants are not required to include a request for planning funds with the
LOI, which does not automatically result in the release of planning funds.
Requests for planning funds can be made through the NTIA portal through August 15, 2022. In order to
receive planning funds, applicants must also submit application materials as described in this guidance.
States, D.C., and Puerto Rico can request up to $5,000,000 in planning funds. American Samoa, CNMI,
Guam, and USVI can request up to $1,250,000 in planning funds.
The LOI must include:
A statement that the Eligible Entity intends to participate in the program;
Specific information to identify the agency, department, or office that will serve as the recipient
of, and administering agent for, any BEAD Program award for the Eligible Entity.
The main point of contact at the recipient and administering agency, department, or office for the
purposes of the BEAD Program, with corresponding contact information (including an email
address).
A sample template of the LOI is shown on the following page. If used, it should be saved and uploaded in
PDF format.
26
4.1.1 LOI Template
[On Governor’s Office Letterhead]
May 16, 2022
The Honorable Alan Davidson
Assistant Secretary of Commerce for Communications and Information
U.S. Department of Commerce
1401 Constitution Ave., NW
Washington, DC 20230
Dear Assistant Secretary Davidson:
On behalf of [INSERT ELIGIBLE ENTITY NAME], I am declaring our intent to participate in
the Broadband Equity, Access, and Deployment Program.
The [INSERT DEPARTMENT, AGENCY, OR OFFICE] will serve as the as the recipient of,
and administering agent for, any BEAD Program award for this eligible entity. The following
individual will serve as the point of contact for all correspondence:
[INSERT NAME AND CONTACT INFOINCLUDING EMAIL ADDRESS]
The [INSERT ELIGIBLE ENTITY NAME] is also requesting $[INSERT AMOUNT]
1
in initial
planning funds.
2
Sincerely,
[Signed by the Governor]
3
1
States, D.C, and Puerto Rico can request up to $5,000,000 in planning funds. American Samoa, CNMI, Guam,
and USVI can request up to $1,250,000 in planning funds.
2
Including a request for planning funds is not required in the Letter of Intent. Requests for planning funds can also
be made through the NTIA portal through August 15, 2022. To receive funding, Eligible Entities must also submit
application materials through the NTIA Grants Portal including standard documentation and a budget narrative.
3
Or by the chief executive of the Eligible Entity.
27
4.1.2 LOI Submission Instructions
1. From the Application Workspace, locate the Letter of Intent section and click the Get Started
button.
2. Review the Instructions for the Letter of Intent. Notice the Steps highlighted in the sidebar to the
right. Click the Next button to proceed. Click the X in the upper right corner of the modal to return
to the Application Workspace.
3. Click the Upload Files button to select the file(s) to upload or drag and drop the file(s) into the
upload files space.
28
4. Click the Done button on the pop-up window.
5. Verify the uploaded file(s) in the Upload Letter of Intent window. If necessary, click the delete
icon to remove the file(s). After uploading the Letter of Intent file(s), click the Save and Next
button.
6. Select Yes, No, or Decide Later. A red asterisk (*) indicates a required response.
a. If you select Yes, please proceed to the next section, Project Narrative and Eligibility.
b. If you select No, you can change your response and indicate your intent to request
Planning Money if you return to this page by 11:59 p.m. Eastern Daylight Time (EDT)
on July 18, 2022.
c. If you select Decide Later, you can still indicate your intent to request Planning Money if
you return to this page by 11:59 p.m. Eastern Daylight Time (EDT) on July 18, 2022.
Note: BEAD Initial Planning Fund Applications are due on August 15, 2022. However, indication
to apply for those funds through submission of a Letter of Intent should be completed by the July
18
th
deadline indicated above.
Click on the Next button to return to the Application Workspace.
29
7. Upon completing the final step of the Letter of Intent section, a green banner with a confirmation
message will appear at the top of the screen. As noted in the banner, an email will be sent from
the NTIA Grants Portal confirming the date and time of your submission. Click the X icon in the
upper right corner to close the green banner confirmation message. To update the Status of
Applying for Planning Money, or to delete and upload a new Letter of Intent, click the
Review/Update button in the Letter of Intent section.
8. Click the radio button next to the action you wish to take, then click the Next button. Click the X in
the upper right corner of the modal to return to the Application Workspace.
30
BEAD Initial Planning Funds Application Instructions
Prior to submitting an application for Initial Planning Funds, the Eligible Entity must submit a
Letter of Intent. Once the Letter of Intent is submitted, the Eligible Entity may submit an
application for Initial Planning Funds. The Initial Planning Funds application must include the
following:
Project Narrative
SF 424 (Application for
Federal Assistance)
SF 424C (Budget
Information - Construction
Programs)
Detailed Budget Justification
Budget Narrative
Negotiated Indirect Cost Rate
Agreementas applicable
CD-511 (certification of lobbying
activities)
SF-LLL (disclosure of lobbying
activities)as applicable
SAM.gov registration
4.2 Project Narrative and Eligibility
The Project Narrative section includes a Project Summary for the use of the Initial Planning Funds, as
well as an indication of which activities for which those funds will be used. Applicants must input both the
Project Summary and the Activities in the NTIA Grants Portal.
4.2.1 Project Summary for Initial Planning Funds
Applicants should provide, in a narrative project summary, an overview of the proposed project, including
activities and intended outcomes associated with the project. The project summary should include an
overview of how the applicant intends to use awarded funds, including indicating partners or subrecipients
who may support the applicant to execute the funded activities. Applicants should provide a clear and
compelling description of the project and should be clear about the project‘s intended benefitsfor
example, outlining how the project will advance the objectives of the BEAD program as well as specific
objectives outlined in the NOFO for Initial Planning Funds and Five-Year Action Plan. For the Project
Summary, the applicant may provide high-level financial figures and budgetary information. It is important
that the numbers presented in this section are consistent throughout the entire application. Applicants are
limited to 1000 words for their Project Summary.
31
4.2.2 Activities Allowed for Initial Planning Fund
The applicant must also identify which allowable Initial Planning Fund areas it intends to use for its funds
in the narrative, including providing information on how those activities will support the BEAD program
objectives and support the development of a Five-Year Action Plan. The applicant will select, from the
below list, all activities that it intends to conduct using the Initial Planning Funds. (Note: applicants must
select at least one box)
Research and data collection, including initial identification of unserved locations and
underserved locations consistent with the rules, regulations, and processes the Commission has
established for making these determinations in the Broadband DATA Maps;
The development of a preliminary budget for pre-planning activities;
Publications, outreach, and communications support;
Providing technical assistance to potential subgrantees, including through workshops and events;
Training for employees of the broadband program or office of the Eligible Entity or employees or
political subdivisions of the Eligible Entity, and related staffing capacity or consulting or contracted
support to effectuate the goals of the BEAD Program;
Establishing, operating, or increasing capacity of a broadband office that oversees broadband
programs and broadband deployment in an Eligible Entity;
Asset mapping across the Eligible Entity to catalogue broadband adoption, affordability, equity,
access and deployment activities occurring within the Eligible Entity;
Conducting surveys of unserved, underserved, and underrepresented communities to better
understand barriers to adoption;
Costs associated with meeting the local coordination requirements including capacity building at
the local and regional levels or contracted support;
Sample Project Summary for Initial Planning Funds
[Entity Name] is requesting funding through the Broadband Equity, Access, and Deployment (BEAD) Program to help support
our pursuit of offering more reliable broadband service to our service area. Our proposed project, [Project Title], will [brief
summary description of the project]. Through the [Title of Project] project, we be able to [insert project’s intended benefits].
More specifically, our project is focused on advancing the objectives of the BEAD Program, including [insert specific objectives
outlined in the NOFO]. To do so, [Title of Project] intends to utilize the following activities: [insert list of intended activities].
Activity 1, [insert activity from provided list], includes [brief description of activity]. The intended outcome of Activity 1 is [X].
Activity 2, [insert activity from provided list], includes [brief description of activity]. Completing Activity 2 will result in [Y].
Repeat for each activity proposed.
The funds awarded through the BEAD Program will be used to help support the previously mentioned project activities. [Entity
Name] will have [#X] partners, including [#X] subrecipients, who will support in the execution of the funded activities: [List
partner names]. [Partner #1] is [brief description of partner, including mention of whether they are a subrecipient]. Activities [1,
2, 3...] will be supported by [Partner #1]. Repeat for each partner/subrecipient.
The [Project Title] project plans to use Initial Planning Funds to support the following areas: [list of applicable Initial Planning
Fund areas]. [Planning Fund Area #1] will both support the development of our Five-Year Action Plan and BEAD program
objectives by [Enter description]. Repeat for each Planning Fund Area.
OPTIONAL The overall proposed project cost is [$X], which includes [$X] in federal funding and [X% or $X] in matching
funds. [Insert other high-level financial figures/budgetary information. Ensure any numeric data provided aligns with other
sections of the application package].
32
Reasonable post-NOFO, pre-award expenses in an amount not to exceed $100,000 relating to
the preparation of program submissions to NTIA (such as the Letter of Intent) or adding additional
capacity to state or territorial broadband offices in preparation for the BEAD Program may be
reimbursed if they are incurred after the publication date of this NOFO and prior to the date of
issuance of the grant award from NTIA, except that lobbying costs and contingency fees are not
reimbursable from grant funds. Pre-award expenses should be clearly identified in the proposed
project budget. Additionally, pre-award costs are incurred at the sole risk of the applicant and will
not be reimbursed by NTIA if the proposed project does not receive an award pursuant to this
Program. Pre-award expenses must be approved by NTIA and the Grants Officer in writing to be
considered allowable; and
Other uses approved in advance writing by the Assistant Secretary (including in response to an
Eligible Entity’s request) that support the goals of the Program.
Note: Requests for approval of uses not listed here should be made in writing to the Assistant
Secretary and submitted through the appropriate Federal Program Officer. Eligible Entities should
make such requests on a timely basis to facilitate resolution prior to point at which the Eligible
Entity seeks to make the expenditure or expenditures at issue.
4.2.3 Project Narrative and Eligibility Submission
Instructions
1. Click the Get Started button to begin the Project
Narrative and Eligibility section.
33
2. Enter Project Narrative and Eligibility information
in the fields provided. A red asterisk (*) indicates a
required field.
a. Click the drop-down icon to select a
response to the question: “Are you
coordinating with your State/Territory
Broadband office?” Options are Yes, No,
Not Applicable.
b. Use the scroll bar to scroll up and down the
screen to view all options among the Select
planning and pre-deployment activities,
click the box next to each activity that is
applicable. At least one activity must be
selected.
3. Upon making your selection(s), click the Next
button to return to the Application Workspace.
4.3 Form 424 (Application for Federal Assistance)
Applicants are required to fill out, directly in the
NTIA Grants Portal, an SF 424 Application for
Federal Assistance. The table below provides
instructions on each field that must be filled out.
Applicants are encouraged to fill out the SF 424
template available on the NTIA Grants Portal and
on the BEAD Program webpage on
www.internetforall.gov prior to filling out the form on
the NTIA Grants Portal. Instructions on how to
complete the SF 424 can be found on the
grants.gov website, or at this link:
https://www.grants.gov/web/grants/forms/sf-424-family.html
.
Note: Some of these fields will pre-populate as a result of the data entered when the applicant’s
organization is added.
Authorized Organization Representative
The Applicant should identify their Authorized
Organization Representatives (AOR) in the SF 424.
An AOR is a member of your organization
authorized to submit applications in the NTIA Grants
Portal on behalf of the organization. Note that in the
submission of the application, only the AOR will be
able attest that all statements are true and submit
the application.
34
1. Click the Get Started button to
begin the Form 424 section.
2. Click each header of the Application for Federal
Assistance SF-424 form to expand or collapse the
section on the screen. Notice the Steps highlighted in
the sidebar to the right.
Click the Application Information header to expand
the section, enter application information using the fields
provided. A red asterisk (*) indicates a required field.
3. Use the scroll bar to scroll to the next sections, click
on each header to expand the section, and continue
entering information for the remaining sections of the
Form 424:
Address
Organizational Unit
Name and contact information of person
to be contacted on matters involving this
application (Authorized Organizational
Representative - AOR)
Type of Applicant
35
4. Click the Save and Next button to proceed to the next
step, Program and Project Information.
4.3.1 Program and Project Information
5. Click each header of the Program
and Project Information step to
expand or collapse the section on
the screen. If needed, click the
Program Information header to
expand the section and enter
program information using the fields
provided. Some information
previously provided will be pre-
populated in various fields. Use the
scroll bar to scroll to the next
section to continue entering
information for the remaining
field(s). A red asterisk (*) indicates
a required field.
6. Click the Previous button to go back to the previous step;
click the Save and Next button to proceed to the next step,
Estimated Funding.
36
4.3.2 Estimated Funding
7. Enter estimated funding information in the fields
provided. A red asterisk (*) indicates a required field.
The following fields must match:
Form 424 18a must match Form 424C 17c
Form 424 18g must match Form 424C 16c
Click the Previous button to go back to the previous
step; click the Save and Next button to proceed to
the next step, Questions.
4.3.3 Questions
8. Click the radio button to select a response to
the questions presented. A red asterisk (*)
indicates a required field. For question 19, if you
select response ‘a.’ select a State Review Date.
For question 20, if you select ‘Yes,’ provide an
explanation in the space provided.
Click the Previous button to go back to the
previous step; click the Save and Next button to
proceed to the next step, Authorized
Organizational Representative.
4.3.4 Authorized Organizational Representative
9. Enter the AOR information in the fields provided. A
red asterisk (*) indicates a required field.
The AOR will receive an email notification indicating
that they have been added to the Funding Program
application. If they are not already registered with
the NTIA Grants Portal, they will receive a second
email with a link to set their password to the grant
portal (see the
Registration Welcome Email with
Initial Login Link section of this guide and follow the
instructions). If the current applicant indicates
themselves as the AOR, they will not receive an
email as they are already registered in the Portal.
37
Click the Previous button to go back to the previous step; click the Save and Generate PDF button to
complete the Form 424 Section and return to the Application Workspace.
Once you click Save and Generate, a new tab will
open with the generated pdf. Click the download
button or the print button in the upper right corner to
save a copy of the pdf for your records. The
generated Form 424 will be saved on your
application record and will be available for review
and download by the AOR during the final step
before submission.
If the designated AOR needs to be updated, return
to the Form 424 to make the change. Refer to the
instructions above for guidance.
10. Click the download button or the print button in the upper right corner to save a copy of the pdf for
your records.
11. Return to the Application Workspace still open on the previous browser tab.
4.4 Budget Form 424C
Applicants are required to complete on the NTIA Grants Portal a SF 424 C- Budget Information
Construction Programs budget. Applicants are encouraged to fill out the SF 424 C template available on
the NTIA Grants Portal and on the BEAD program webpage on www.internetforall.gov
prior to filling out
the form directly in the NTIA Grants Portal. Instructions for the OMB forms are available at:
https://apply07.grants.gov/apply/forms/instructions/SF424C_2_0-V2.0-Instructions.pdf
Note the special guidance below for completing the SF-424C for BEAD applications.
In Column (a), enter the total project cost for each line item.
38
In Column (b), if this is an application for a "New" project, enter that portion of the cost of each
item in Column (a) that is not allowable for federal assistance. Contact the federal agency for
assistance in determining the allowability of specific costs. If this application entails a change to
an existing award, enter the adjustment [+ or -] to the previously approved costs (from column
(a)) reflected in this application.
In Column (c), enter total Allowable Costs (Column (a) (b)).
Note that for the Initial Planning Funds, only Line 1 “Administrative and Legal,” Line 5 “Other
architectural and engineering fees,” and Line 11 “Miscellaneous” are applicable cost categories in
the SF 424C.
Line 1. Administrative and Legal: Enter estimated amounts needed to cover administrative
expenses. Do not include costs which are related to the normal functions of government.
Allowable legal costs are generally only those associated with the purchases of land, which is
allowable for federal participation, and certain services in support of construction of the project.
Line 5. Other architectural and engineering fees: Enter estimated engineering costs, such as
surveys, tests, soil borings.
Line 11. Miscellaneous: Enter estimated miscellaneous costs.
Line 12. SUBTOTAL: Total of items 1 through 11.
Line 14. SUBTOTAL: Enter the total of lines 12 and 13.
Line 16. TOTAL PROJECT COSTS: Subtract line 15 from line 14.
Line 17. Federal assistance requested: The percentage used should result in the exact dollar
amount of the federal funding request. Note that the amount in 17c will need to be identical to the
federal funding request in the Budget Narrative and Detailed Budget Justification, and tie out to
the exact dollar in all relevant sections of the application.
o Note that subtotals will need to be easily traceable to the line items in Column G of the
Detailed Budget Justification.
The following budget categories are likely not applicable to Initial Planning Funds
Applications:
Line 2. Land, structure, rights-of-way, appraisals, etc.: Enter estimated site and right(s)-of- way
acquisition costs (this includes purchase, lease, and/or easements).
Line 3. Relocation expenses and payments: Enter estimated costs related to relocation advisory
assistance, replacement housing, relocation payments to displaced persons and businesses, etc.
Line 4. Architectural and engineering fees: Enter estimated basic engineering fees related to
construction (this includes start-up services and preparation of project performance work plan).
Line 6. Project inspection fees: Enter estimated engineering inspection costs.
Line 7. Site work: Enter estimated costs of site preparation and restoration which are not included
in the basic construction contract.
Line 8. Demolition and removal: Enter estimated demolition and removal costs.
Line 9. Construction: Enter estimated cost of the construction contract.
Line 10. Equipment: Enter estimated cost of office, shop, laboratory, safety equipment, etc. to be
39
used at the facility, if such costs are not included in the construction contract.
Line 13. Contingencies: Since contingency fees are not reimbursable expenses through BEAD,
leave row 13 blank.
Line 15. Project (program) income: (Not applicable to BEAD Initial Planning Funds) The disposition of
program income shall be in accordance with the applicable Federal administrative requirements.
Program income must be deducted from total allowable costs to determine net allowable costs unless a
Federal awarding agency specifies otherwise in its regulations, terms of conditions of the Federal
award, or through prior approval (for additional detail, see 2 CFR 200.307 Program income
).
Otherwise, the value for this line item should be $0.
4.4.1 Budget Form 424C Submission Instructions
1. Click the Get Started button to begin
the Budget Form 424C section.
2. Enter Budget Information - Construction Programs
(424C) information in the fields provided. Use the
scroll bar to scroll up and down the screen.
40
3. Click the Save button to complete the
Budget Form 424C Section and return to the
Application Workspace.
4. A new browser tab may open with the completed
Form 424C. Click the download button or the print
button in the upper right corner. The NTIA Grants
Portal is likely still open on the previous browser tab.
5. Return to the Application Workspace still open
on the previous browser tab.
4.5 Detailed Budget Justification and Budget
Narrative
Applicants must upload both a Detailed Budget Justification and a Budget Narrative to the NTIA Grants
Portal. Templates for both of these required documents are available on the BEAD Program Page on the
NTIA Grants Portal and also available on the BEAD Program webpage on www.internetforall.gov
.
The applicant must ensure that the total project budget information matches across ALL budget forms
and templates, including the SF 424, SF-424C, Detailed Budget Justification, and Budget Narrative.
4.5.1 Budget Narrative
Applicants are required to submit a Budget Narrative that
adequately describes all proposed activities and costs for their
grant-funded project. The applicant must download the Microsoft
Word file template (available on the NTIA Grants Portal and on
the BEAD Program webpage on www.internetforall.gov), fill in all
required information, and upload the completed file to the NTIA
Grants Portal. The upload must be provided as Word file, and
not converted to a PDF prior to upload. There is no word limit.
The following information should be included in the budget
narrative, following the template provided on the NTIA Grants
Portal and on the BEAD Program webpage on
www.internetforall.gov:
Applicant Name
Organization Type
Proposed Period of Performance
Total Project Costs
Total Federal Grant Request
41
The applicant should provide the following information under the respective headers:
4.5.2 Administrative and Legal Expenses
Administrative and legal fees should be listed by category (ex. rent, training, grant management, etc.), or
broken down by line item as much as possible. Each line must include the total time (ex. total number of
hours), cost per unit, and the total cost for that line item. If applicable, time commitment(s) such as hours
or level of effort should be provided.
Along with the calculations for each line item, applicants
must provide a description of each charge to include what it
is, who will be doing it (if applicable and if known), and how
it relates to the project objectives. If the applicant will be
providing a cash or in-kind match in this cost category, this
must be noted and explained in the justification.
If an applicant plans to charge indirect costs to this award,
they should also be included into the Administrative and
Legal Expenses line item. The Detailed Budget Justification
template and the budget narrative should clearly explain
how they are being applied and to what. Additionally, if
indirect costs are proposed, the applicant must also be
sure to attach a copy of their most recent negotiated
indirect cost rate agreement for analysis by the NIST Grants Management Division to ensure they are
applied appropriately.
If indirect costs are proposed in addition to local match/cost share, the applicant is required to provide in
their budget narrative the break-down of the federal amount and local share of indirect costs, consistent
with OMB Memorandum M-22-02 to assist with government-wide reporting of indirect costs.
4.5.3 Sample Justification for Federally Funded Activities
Activity Total Time Rate Total Cost
Grant Management activities 300 hours $50 per hour $15,000
Legal Fees 60 hours $150 per hour $9,000
Example details for items above:
Grant Management Activities ($15,000) Staff time (exact staff TBD) to complete mandatory grant
management activities such as completing reports, responding to audit requirements, conducting
budgetary activities, and other activities as required by the grantor. These activities are necessary to
meet the reporting and compliance requirements of the grant program. This position will be Federally
funded/not match funded.
Legal Fees ($9,000) Development of agreements and MOUs between the various organizations
involved in the grant, to include sub-grantees. Also, will conduct legal reviews for all contracts.
Examples of Administrative Expenses
Include Costs Attributable to:
Accounting, auditing, contracting,
budgeting, and general legal services;
facility occupancy costs, e.g., rent,
utilities, insurance, taxes, and
maintenance; general liability insurance
that protects the organization (not directly
related to a program); depreciation on
buildings and equipment; general office
supplies; and general and administrative
salaries and wages.
42
4.5.4 Detailed Budget Justification
Applicants are required to submit a Detailed Budget Justification to
provide general budget information and detailed project costs. The
applicant must download the Microsoft Excel file template (available on
the NTIA Grants Portal and on the BEAD Program webpage on
www.internetforall.gov), fill in all required information, and upload the
completed file to the NTIA Grants Portal. The upload must be provided as
an Excel file, and not converted to a PDF prior to upload. The applicant
should not alter the layout of the provided templates, except to insert additional line-items as needed.
4.5.5 Detailed Budget Justification and Budget Narrative Submission Instructions
1. Click the Get Started button to begin the
Detailed Budget Justification and Budget
Narrative section.
Tips for Completing Detailed Budget Justification
All budget amounts must exactly match or tie out across all budget justification. For example, do not provide estimates or
approximate amounts in the Budget Narrative that do not exactly match amounts the SF-424, SF-424C, and all relevant
sections in the application.
All subtotals and totals (including line items) must be rounded to whole dollars without cents. Although unit costs may include
cents, once multiplied by the number of units, the result must be rounded to the nearest whole dollar. Amounts ending in
$.49 or less should be rounded down to the nearest whole dollar, while amounts ending in $.50 or more should be rounded
up to the next whole dollar. (For example, a subtotal of $2.17 would be rounded down to $2.00, while a subtotal of $2.72
would be rounded up to $3.00.) It is acceptable if .00 appears at the end of an amount; that is auto-formatted in some
versions of the form.
All project costs should be contained in the budget justification. Subrecipient costs should be rolled up into the primary
applicant‘s budget justification. Do not provide separate budgets or budget documentation for subrecipients.
All direct and indirect costs will be evaluated for allowability, allocability, and reasonableness according to the relevant cost
principles. Only include costs that meet all criteria and note that additional detail or documentation may be requested.
43
2. Click the Upload Files button, or drag and drop
files into the space provided for each required
document.
3. Click the Done button.
4. Enter Total Federal Funds Requested into the
field provided, then click the Save button to return
to the Application Workspace.
Note: This Amount should match field 18a from the
Form 424.
4.6 Negotiated Indirect Cost Rate Agreement as applicable
If indirect costs are included in the proposed budget, the applicant must upload a copy of the approved
negotiated agreement if this rate was negotiated with a cognizant federal audit agency. If the rate was not
established by a cognizant federal audit agency, provide a statement to this effect. If the successful
applicant includes indirect costs in the budget and has not established an indirect cost rate with a
cognizant federal audit agency, the applicant will be required to obtain such a rate in accordance with
Section B.06 of the Department of Commerce Financial Assistance Standard Terms and Conditions
Dated November 12, 2020.
Alternatively, consistent with 2 C.F.R. § 200.414(f), applicants that do not have a current negotiated
indirect cost rate may elect to charge indirect costs to an award pursuant to a de minimis rate, in which
case a negotiated indirect cost rate agreement is not required. Applicants proposing a de minimis rate
pursuant to 2 C.F.R. § 200.414(f) should note this election as part of the budget portion of the application.
44
4.7 Additional Required Documents
All additional documents should be signed by the AOR identified in the SF-424. Ensure that the name
listed and the signature match.
4.7.1 Form CD-511- Certification Regarding Lobbying
The applicant must upload a completed Form CD-511 Certification
Regarding Lobbying that certifies that Federal funds have not been
used and will not be used for lobbying in connection with this request
for Federal financial assistance. A fillable Form CD-511 is available
to be downloaded and filled out on the BEAD Program page on the
NTIA Grants Portal and on the BEAD Program webpage on
www.internetforall.gov
.
4.7.2 Standard Form-LLL- Disclosure of Lobbying Activities
The Standard Form-LLL- Disclosure of Lobbying Activities must be
completed and submitted for those applicants that need to disclose
lobbying activities that have been secured to influence the outcome of
a Federal action.
4.7.3 SAM.gov registration
The System for Award Management (SAM.gov) is an official website of the U.S. Government. The SAM
database is managed by the General Services Administration, which is responsible for acquiring goods
and services for government agencies. In order to do business with any federal government agency, an
Eligibly Entity must complete SAM registration on SAM.gov. There is no cost to use SAM.gov.
Applicants should upload evidence of SAM.gov registration of the Eligible Entity identified in the SF-424.
The documentation should include the Legal Name, Unique Entity ID (UEI), and expiration date of the
registration.
4.7.4 Additional Required Documents Submission Instructions
45
1. Click the Get Started button to begin
the Additional Required Documents
section.
2. Click the Upload Files button to select the
file(s) to upload, or drag and drop the file(s) into
the upload files space provided. A red asterisk (*)
indicates that a document is required. Click the
delete icon to remove a file. Click the Save
button to return to the Application Workspace.
For the SAMS.gov Registration required
document, a screenshot of the holder’s
SAMS.gov registration information page is
sufficient.
4.8 Attestation & Application Submission
Once the applicant has completed its application, it is advised to proofread the materials submitted and
verify the consistency of data provided in more than one location (particularly with respect to the project
budget).
The final Attestation & Generate Forms & Submit section is accessible only to the designated
AOR in Form 424; the Attestation & Generate Forms & Submit section is not accessible to other team
member roles. The AOR must complete the Attestation & Generate Forms & Submit section.
By submitting this application, the applicant or the AOR certifies that the information and responses in the
application are material representations of fact and are true and correct.
46
1. Click the Get Started button to
begin the Attestation & Generate
Forms & Submit section.
2. The AOR is responsible for
reviewing all forms and
application documents listed on
the Review Forms & Submit
screen before final submission. If
changes are needed, exit this
modal by clicking on the white X
in the upper-right corner, then
return to the corresponding
section(s) in the Application
Workspace and complete all
steps of the section(s) to update and
save changes to the form(s) and
document(s).
3. Click the document link in the Review
Forms & Submit modal screen to
download the pdf form or document. It
is recommended to download each
form and document for archival
purposes.
4. Click the Next button to get to the
Attestation step.
5. Upon reviewing the forms for final
submission, click the required checkbox
next to “I AGREE,” then click the Next
button.
47
6. A pdf version of Form 424 with the
AOR attested signature and date at the
bottom of the form will open in a
separate tab. Click the download
button or the print button in the upper
right corner to save a copy of the pdf
for your records.
7. Click the Next button to complete the attestation step.
Important: Once the AOR confirms submission by clicking Next, the application submission process has
completed, and the application records will be locked and awaiting review by NTIA.
48
8. Upon confirming attestation, you will be
returned to the Application Workspace
showing that each section status is now
marked as submitted.
9. A confirmation email will be sent from
the Portal system.
Congratulations!
You have successfully completed your application for the Broadband Equity, Access,
and Deployment (BEAD) Grant Program. Please reach out to BEAD@NTIA.gov for
BEAD programmatic inquiries. Please reach out to NGPhelpdesk@ntia.gov if you have
any outstanding technical questions or need additional guidance on submitting your
application.
49
Appendix
Repository of Documents Required for Download
Budget Narrative: Applicants will create and submit a budget
narrative that adequately describes all proposed actives and costs for
their grant-funded project. Applicants must complete the file template
(available to download on the BEAD Program Page
and found in the
BEAD Initial Planning Funds ZIP folder) fill in all required information
and upload the file. The file must be uploaded as a Word file, and not
converted to a PDF.
Detailed Budget Justification: Applicants are required to submit a
Detailed Budget Justification to provide general budget information and
detailed project costs. The applicant must use the Microsoft Excel file
template (available to download on the BEAD Program Page
and
found in the BEAD Initial Planning Funds ZIP folder), fill in all required
information, and upload the file to the NTIA Grants Portal.
CD-511: A copy of this form is available to download on the
BEAD
Program Page and is found in the BEAD Initial Planning Funds Zip
folder.
Standard Form-LLL: Standard Form-LLL must be completed and
submitted for those applicants that need to disclose lobbying activities
that have been secured to influence the outcome of a Federal action.
A fillable Form SF-LLL is available to download on the
BEAD Program
Page and can be found in found in the BEAD Initial Planning Funds
ZIP folder.